On the afternoon of July 3, 2009, a fire started in a flat on the ninth floor of Lakanal House, a 14-storey council block in Camberwell, south London. It spread outward, upward and downward faster than the building’s design assumed, and six people died, three of them children. Residents were told to stay in their homes, which is advice that only works when every compartment holds. The 2013 inquest found that decades of building work had weakened those compartments. This guide covers how stay-put doctrine depends on compartmentation, how unrecorded changes degraded it, and what the coroner asked government, the council and the fire brigade to fix.

Lakanal House: a 1959 maisonette block on the Sceaux Gardens estate

Lakanal House was completed in 1959 as part of the Sceaux Gardens estate in Camberwell, in the London Borough of Southwark, and the council was its landlord at the time of the fire. It belonged to a generation of postwar social housing in which local authorities built upward to replace damaged and overcrowded housing stock. The design used maisonettes, meaning homes spread over two levels, instead of single-floor flats. Lakanal used a scissor-section arrangement in which a maisonette could run across the building above or below a central access corridor, with one level on one side of the block and the other level crossing over. Access corridors served the maisonettes on some floors and not on others.

That layout matters for two reasons that came up repeatedly after the fire. The first is that the boundaries between homes in a scissor-section block run in complicated three-dimensional paths, so the fire separation between one home and its neighbors depends on many junctions of walls, floors and ceilings meeting correctly. The second is that a firefighter or a call handler who assumes that flat numbers rise floor by floor in a simple vertical stack can misjudge where a given home actually sits relative to a fire. The inquest heard evidence about crews having difficulty locating flats and understanding the layout, and the coroner’s later recommendations about premises information and signage came out of that evidence.

For an American reader the closest translation is a mid-century public housing or apartment high-rise with split-level units, interior corridors on alternate floors and a long history of maintenance contracts. Buildings like that exist in many U.S. cities, and the general lesson of Lakanal applies to them even though the codes, the terminology and the legal duties are different. I come back to that translation at the end of this guide, after the record itself.

Stay put as a design assumption: what each compartment has to hold

The stay-put principle in British residential fire safety rests on a simple engineering idea. In a purpose-built block of flats designed to the building regulations, each home is meant to be a fire-resisting compartment, with walls, floors, ceilings and entrance doors that hold back fire and smoke for a defined period. If a fire starts in one flat, the people in that flat leave, and the compartment is supposed to contain the fire long enough for the fire service to arrive and put it out. Everyone else can stay where they are, because their own compartments are protecting them, and because keeping them in place leaves the stairs clear for firefighters coming up and for the occupants of the fire flat coming down. The approach was attractive for tall blocks with a single staircase, where a full simultaneous evacuation could put large numbers of people into a smoke-logged stair while crews were trying to use it.

Stay put is therefore a description of how a particular building is expected to behave, and it is only as good as the physical condition of that building. The compartment has to be complete, which means fire-resisting construction around each home, fire-stopping wherever pipes, cables and ducts pass through a compartment wall or floor, self-closing fire doors that actually close, and an external envelope that does not let fire climb or drop from one home to the next. Hidden spaces such as ceiling voids above corridors have to be divided so that fire cannot travel through them unseen. If any of those elements is missing or degraded, the fire can reach homes whose occupants are relying on protection that no longer exists.

The principle also assumes that someone can change the advice when the building is not behaving as designed. Once fire or heavy smoke reaches a home that was supposed to be safe, staying put stops being protective, and the occupants need either a route out or a rescue. That change of advice depends on information flowing from the people calling for help, through the control room, to the incident commander, and back again. Lakanal tested both assumptions on the same afternoon, which is why the inquest spent so much of its time on the building fabric and on the handling of calls.

Stay put is a property of the building on the day of the fire

The advice is valid only if the compartments around each home are intact on the day of the fire, which is a different question from whether they were intact when the building was approved. Every alteration since construction, from a window replacement to a cable run through a corridor ceiling, is a possible breach. A fire service that issues stay-put advice for a particular building is relying on the landlord’s knowledge of every one of those alterations, whether or not that knowledge exists.

July 3, 2009: the fire in flat 65 and how it moved

The fire started on the afternoon of Friday, July 3, 2009, in flat 65 on the ninth floor. The inquest found that it was caused by an electrical fault in a television set. The occupant of that flat got out, which is what the stay-put principle expects of the people in the fire flat. What followed is the part of the record that matters for compartmentation, because the fire did not stay inside the home where it started.

The fire broke out of flat 65 through the external wall and spread to other homes in several directions. It travelled up the outside of the building to homes above, including a flat on the eleventh floor. It also spread sideways, and it spread downward as burning material fell and ignited homes on lower floors, which is a direction of spread that fire safety design has historically given less attention than upward spread. Smoke entered the common corridors and made routes out of some homes impassable. The evidence at the inquest connected that pattern of spread to the external panels around the windows and to gaps in the fire separation inside the building, both of which I take up in the section on the refurbishments.

Six people died. They were Catherine Hickman; Dayana Francisquini and her two children, Thais and Felipe; and Helen Udoaka and her three-week-old daughter, Michelle. Others were injured, and many residents were rescued or brought out by firefighters. I have seen different injury figures in published accounts and I am not going to give one, because I cannot tie any of them to an authoritative source with confidence. Nobody disputes the death toll of six, and it is the figure used by the coroner, the London Fire Brigade and the council.

The fire was attended by a large London Fire Brigade response, and crews carried out rescues in difficult conditions. Some later discussion of the fire treats it as a failure of firefighting, and the inquest did examine command decisions, communication and the difficulty crews had in understanding the layout. The building fabric, however, is the reason the fire was able to reach homes several floors away from flat 65 at all, and a reader who takes away only the operational criticisms has missed the larger part of the record.

The calls to control: advice given to people inside the fire

Several residents called 999 from inside the building, and London Fire Brigade control staff handled those calls under the brigade’s procedures for what it calls fire survival guidance, which covers advice to people who are trapped or threatened by fire and cannot get out on their own. Following the stay-put principle, callers in homes away from the fire flat were generally advised to remain in their homes. Catherine Hickman, in a flat on the eleventh floor, was on the phone to control for an extended period, which was widely reported from the inquest evidence as around 40 minutes, while fire reached her home. The inquest examined how that call was handled, what she was told and how information from it reached the commanders at the scene.

The difficulty the inquest exposed is that the control operator on the phone cannot see the building, and the incident commander at the building cannot hear the call. When a caller reports smoke coming into the home, or fire at a window, that information has to be relayed promptly and in a form the commander can act on, and the commander’s decision about rescue or a change of advice has to come back to the caller. Each relay takes time, and each one can lose the detail that would show the advice is no longer sound. At Lakanal the problem was made worse by the layout, because knowing a caller’s flat number did not tell a crew where that home sat in relation to the fire or to the corridors.

As a clinician I will add one point that does not depend on anything disputed. In residential fires, smoke and toxic gases kill more often than flame does, and a sealed room is protective only while it stays sealed. Advice to stay in place has to be reassessed the moment a caller reports smoke inside the room, because from that point the occupant’s survival time is set by the smoke, not by the fire resistance of a wall that has already been bypassed.

The myth that stay-put advice alone killed them

A version of Lakanal that circulates holds that the fire brigade’s stay-put advice was the cause of the deaths, and that version is a myth, or at best a serious simplification. The advice was the established principle for a building of that type, and it failed because the compartments it depended on had been compromised and because information about conditions in individual homes did not move fast enough to change it. The inquest looked at both the building and the call handling, and anyone summarizing Lakanal should keep both in the account rather than collapsing it into a single cause.

Decades of works: panels, ceiling voids and missing records

Lakanal House was about 50 years old in 2009, and over that time it had been through repairs, maintenance contracts and at least one significant refurbishment. The most discussed work was carried out in the mid-2000s, when the window units and the panels beneath them on the outside of the building were replaced. Evidence at the inquest was that the replacement panels offered very little fire resistance and burned through in a matter of minutes in testing carried out after the fire, which is how fire was able to pass from inside flat 65 to the outside of the building and from the outside into other homes. The original construction, whatever its other faults, had not been tested in the same way, so the record is clearer about the replacement panels than about what they replaced.

The inquest also heard about fire separation inside the building. Over the years, work on the building had affected the fire-stopping in concealed spaces, including the void above the ceilings of the common corridors, which in a scissor-section block runs past the boundaries of several homes. Where fire-stopping in a void like that is removed or never reinstated after work, fire and smoke can travel along it and bypass the compartment walls below. Reports of the inquest describe evidence that such breaches existed at Lakanal and that they allowed fire to spread in ways the original design did not intend. I am describing that evidence in general terms because the detailed findings belong in the inquest record, which is where anyone writing about specific locations in the building should go.

The records problem ran underneath both issues. A landlord can manage the fire safety of a building only if it knows what has been done to that building, and the evidence at Lakanal was that Southwark did not have a complete and reliable picture of the works carried out over the years and their effect on fire separation. The Regulatory Reform (Fire Safety) Order 2005, which came into force in England and Wales in 2006, required a suitable and sufficient fire risk assessment of the common parts of buildings like Lakanal, and the absence of an adequate assessment at the time of the fire was a major thread in the inquest and in the later prosecution. A fire risk assessment carried out without knowledge of hidden alterations cannot find the breaches those alterations created, which is why the coroner’s recommendations reached into how assessments are scoped and how refurbishment work is controlled.

The 2013 inquest and the Rule 43 letters

The inquest did not open in full until early 2013, more than three years after the fire. The delay was largely because the Metropolitan Police investigated the deaths, and that investigation did not result in criminal charges against any person. The inquests into the six deaths were then heard together, with a jury, before Judge Frances Kirkham sitting as an assistant deputy coroner, and the hearings ran from January to the end of March 2013. The jury returned its verdicts at the close of the hearings, and the coroner then turned to the part of the process that this guide is mainly about.

At the time, Rule 43 of the Coroners Rules 1984 allowed a coroner who believed that action should be taken to prevent future deaths to report that concern to a person or body with power to act. Recipients were expected to respond in writing. Rule 43 was replaced in July 2013, a few months after Lakanal, by the prevention of future deaths reports under the Coroners and Justice Act 2009, which is why later material uses the term Regulation 28 for the same kind of document. The Lakanal letters were among the last significant reports issued under the old rule, and they were addressed to the Secretary of State for Communities and Local Government, to Southwark Council and to the London Fire Brigade, among others.

A Rule 43 letter is a recommendation, and the recipient was obliged to respond, not to comply. That legal status matters for how emergency managers read the Lakanal outcome. The coroner could set out what she believed should change and why, based on evidence tested in open court, but the decision on whether and how to act stayed with the recipients. The letters and the responses were published, and they remain the best primary source on what was asked and what was promised. Anyone who needs the exact wording should read them rather than rely on summaries, mine included.

Treat every refurbishment as a fire safety change

The common mistake behind Lakanal was treating window replacement, cabling, ceiling repairs and similar work as maintenance with no fire safety consequence. Any work that cuts into, replaces or passes through a wall, floor, ceiling, door or external panel can change how a fire spreads, and it has to be checked against the fire strategy for the building and recorded so that the next person assessing the building knows it happened.

What the letters asked for: guidance, Approved Document B, sprinklers and control rooms

The letter to the Secretary of State dealt with national guidance. As it is generally summarized, it asked the department to publish consolidated national guidance on the stay-put principle, including how that guidance should be communicated to residents, so that people in high-rise homes would understand what they were expected to do and why. It asked for clearer guidance on fire risk assessment of residential blocks, including the extent to which assessors should look inside individual homes, given that the compartment boundaries of a home are part of the fire safety of the whole building. It also asked the department to encourage providers of housing in high-rise residential buildings to consider retrofitting sprinklers.

The most often cited recommendation concerned Approved Document B, the statutory guidance that supports the fire safety requirements of the building regulations in England. The coroner asked for it to be reviewed, with attention to the spread of fire over the external envelope of buildings and to how the guidance applies to refurbishment work, and she criticized the document as difficult to use and understand for the people who need to apply it. The government’s written response accepted that the guidance would be reviewed. What happened to that commitment afterward is a separate history involving later events, which falls outside this account, and readers who want it should go to the government’s own published responses and to official sources rather than secondary commentary.

The letters to Southwark and the London Fire Brigade were operational. The council was asked to address its management of fire safety in its housing stock, including inspection of its buildings, the training and oversight of people who carry out work on them, and the provision of information such as clear signage of floor and flat numbers that would help crews find their way in an emergency. The brigade was asked to look at the training of control staff in handling fire survival guidance calls, at how information passes between the control room and incident commanders, and at how crews get information about unusual building layouts before and during an incident. The London Fire Brigade published its response and made changes to its procedures and training, and its own published material is the right place to verify what those changes were.

Southwark in court in 2017 and what transfers to an American agency

In 2017, after a prosecution brought by the London Fire Brigade, Southwark Council pleaded guilty to four offences under the Regulatory Reform (Fire Safety) Order 2005 relating to Lakanal House. Contemporary reporting gave the fine as 270,000 pounds with costs of 300,000 pounds. The offences concerned the council’s failures as the responsible person for the building, including the failure to carry out a suitable fire risk assessment, which ties the criminal outcome directly to the compartmentation and records problems the inquest had examined. The prosecution came almost eight years after the fire, and it remains the formal legal conclusion of the Lakanal record as far as liability for the building’s condition is concerned.

Translating Lakanal to the United States takes some care. American high-rise residential fire safety rests on different codes, adopted locally, and the terminology differs as well, since U.S. practice tends to speak of shelter-in-place or defend-in-place strategies and of fire-rated assemblies and firestopping. Many older U.S. residential high-rises lack sprinklers, and requirements for retrofitting vary by jurisdiction. I am not going to describe what any particular code section requires, because the edition in force and local amendments differ from place to place, and your fire marshal or building official is the authority on what applies to a given building.

The mechanism transfers without translation, however. Any building where occupants are advised to remain in place depends on fire separation that can be degraded by ordinary work, and on a records system that tells inspectors and responders what has been changed. Any 911 center that handles calls from people trapped in a residential fire depends on fast relay between the call taker and the incident commander, and on a defined point at which the advice to a caller changes. Lakanal shows what happens when the building record and the information chain fail together, and both of those can be checked at an American agency long before the next fire.

What to do at your agency

  • The fire marshal or fire prevention bureau chief pulls the list of residential buildings in the jurisdiction above the local high-rise threshold, and the job is finished when the list shows which ones have pre-incident plans that note split-level units, unusual corridor arrangements or confusing unit numbering.
  • The fire marshal asks the building official for permit records of window, facade, ceiling and cabling work on those buildings over the past ten years, and the job is finished when each pre-incident plan notes which alterations were permitted and which buildings have no records at all.
  • The 911 center supervisor pulls the written procedure for calls from occupants trapped or threatened in a residential fire, and the job is finished when the procedure states who decides that advice to a caller changes from remaining in place to leaving or awaiting rescue, and how that decision is relayed to the caller.
  • The communications training coordinator selects one recorded call from a past structure fire involving an occupant who could not get out, and the job is finished when the call has been reviewed in a quality assurance session with the timeline from the caller’s report of smoke to the relay of that information to command written down.
  • The training officer adds one inject to the next high-rise drill already on the calendar in which a caller several floors above the fire reports smoke entering the apartment, and the job is finished when the after-action report records how long the information took to reach the incident commander and how long the reply took to reach the caller.
  • The community risk reduction coordinator drafts one page of resident guidance for the jurisdiction’s residential high-rises explaining when to stay and when to leave, and the job is finished when the fire marshal has reviewed it for consistency with local procedure and the 911 center supervisor has confirmed it matches what call takers say.

Takeaways

  • The Lakanal House fire began on July 3, 2009, in flat 65 on the ninth floor of a 14-storey Southwark council block, and the inquest found it was caused by an electrical fault in a television.
  • Six people died, three of them children, and the fire spread upward, sideways and downward to homes the compartmentation was supposed to protect.
  • Stay-put advice depends on each home being an intact fire-resisting compartment, and it is only as sound as the building’s condition on the day of the fire.
  • Replacement external panels and breaches in fire-stopping in concealed spaces allowed fire to bypass the compartments, and the council lacked a complete record of the work done to the building.
  • The 2013 inquest, heard by Judge Frances Kirkham, led to Rule 43 letters to the national government, Southwark Council and the London Fire Brigade, covering stay-put guidance, Approved Document B, sprinklers, fire risk assessment and control room practice.
  • A Rule 43 letter required a written response but not compliance, so the published letters and responses are the primary record of what was asked and promised.
  • Southwark Council pleaded guilty in 2017 to four offences under the Regulatory Reform (Fire Safety) Order 2005, tying the legal outcome to its failures as the responsible person for the building.
  • Any agency whose procedures rely on occupants remaining in place should check both the building records and the speed with which a caller’s report of smoke reaches the incident commander.
Questions or a different view?

Reach me through the contact page. I read every message.