Hurricane Andrew came ashore in south Dade County, Florida, early on August 24, 1992, and the federal help that most people expected did not arrive in force for several days. Dade County’s emergency management director asked in public where the cavalry was, and her question became shorthand for a failed response. The after-action record is more complicated than that. State and federal officials blamed each other, and the formal reviews found fault with the design of the system as much as with any person. This guide follows that record through the Federal Response Plan’s first hard test, the FEMA reforms of 1993 and the compact that became EMAC.
- South Dade, August 24, 1992: landfall, a reclassified storm and a disputed toll
- Dade County’s first three days: damage that destroyed the means of measuring it
- The request model in 1992: the Stafford Act and a four-month-old plan
- Tallahassee and Washington: the contested record of who asked for what
- The escalation: Andrew Card’s task force and the active-duty deployment
- Three reviews in 1993: GAO, NAPA and the Florida committee
- FEMA after 1993: James Lee Witt, a forward posture and the plan’s descendants
- From a southern compact to every state: how EMAC came out of Andrew
- What to do at your agency
- Takeaways
South Dade, August 24, 1992: landfall, a reclassified storm and a disputed toll
Andrew formed over the tropical Atlantic in mid-August 1992 and crossed the northern Bahamas before it reached Florida. The National Hurricane Center’s report on the storm places landfall in south Dade County, near Homestead, in the early morning hours of August 24. Andrew was a compact storm. Its most destructive winds fell across a band of southern Dade that took in Homestead, Florida City, Cutler Ridge and the farmland and neighborhoods around them, and downtown Miami to the north was damaged far less. The storm then crossed the Gulf of Mexico and made a second landfall in Louisiana on August 26.
The intensity of record changed ten years later. Andrew was classified as a Category 4 at landfall in 1992. In 2002 the National Hurricane Center finished a reanalysis that raised its estimate of the landfall winds and reclassified the storm as a Category 5. Older training material and some histories still say Category 4, so check which classification a source is using before you quote it. The National Hurricane Center estimated damage in the United States at about $26.5 billion in 1992 dollars, which made Andrew the costliest hurricane in the country’s history until Katrina in 2005. Figures adjusted to later dollars are much larger, and any comparison with a recent storm should state which dollar year it uses.
The death toll cannot honestly be given as a single number. The National Hurricane Center counted deaths caused directly by the storm separately from indirect deaths, such as accidents during cleanup and deaths tied to the loss of power and medical support, and its direct count for the United States is in the low twenties. Tallies that include indirect deaths run considerably higher, and published totals differ according to what each one counts and over what period. I give the direct figure with its source and leave the reader to trace the indirect figures to whoever published them. The housing loss was enormous by any count, with tens of thousands of homes in Dade County destroyed and many more damaged. Estimates of the number of people left without a habitable home in the first days vary widely from one source to another. Homestead Air Force Base was wrecked and never returned to its former role as an active-duty installation.
Dade County’s first three days: damage that destroyed the means of measuring it
The local response in south Dade failed in a particular way, and that failure shaped everything that came after, because the storm destroyed most of the tools the county would have used to measure the damage. Commercial power and the telephone network were out across the damaged area, and accounts from the period describe roads, radio systems and county facilities affected as well. Debris filled the streets. Accounts also describe street signs, house numbers and many landmarks gone, with responders from outside the area struggling to tell one block from the next. Many of the county’s police officers, firefighters and other public employees lived in the damaged zone, so a share of the people who would have run the response were also dealing with their own destroyed homes and displaced families.
Damage assessment depends on people getting out, looking, and getting a report back to someone who can add it up, and in south Dade during the first two or three days every part of that sequence was harder than any plan had assumed. The county knew in a general sense that the damage was catastrophic, because anyone standing in it could see that. Turning that knowledge into the specific numbers a resource request needs was beyond what the local system could do quickly, meaning how many people in which areas needed water, food, shelter and medical care. Meanwhile survivors were living in damaged houses or in the open in late August heat, and shortages of water, ice, food and shelter grew as the days passed.
On August 27, Kate Hale, Dade County’s emergency management director, spoke at a news conference and asked where federal help was. Her words are usually quoted as “Where the hell is the cavalry on this one?” The wording varies slightly between accounts, so I quote only that core question and treat the exact phrasing as approximate. She also said, in substance, that the county kept being told supplies were coming and had not seen them. The remark was carried nationally. Accounts generally treat it as the peak of public pressure on Washington. The reviews I rely on do not establish how much it changed decisions that were already under discussion, and I am not going to claim that it did.
The request model in 1992: the Stafford Act and a four-month-old plan
The legal basis for the federal role was the Robert T. Stafford Disaster Relief and Emergency Assistance Act, which took that name in 1988 when Congress amended the earlier disaster relief law. Under it, a governor asks the President for a declaration after finding that the disaster is beyond the combined capacity of the state and its local governments. A declaration opens federal assistance programs and lets FEMA direct other federal agencies to carry out work. Florida’s declaration came quickly, on the day of landfall, so the delay that followed lay further down the chain, in the step where federal agencies were given specific jobs to do.
That step was governed by the Federal Response Plan, which FEMA had published in April 1992. The plan organized federal assistance into twelve Emergency Support Functions, each with a designated lead agency and supporting agencies. Transportation fell to the Department of Transportation, communications to the National Communications System, public works and engineering to the Department of Defense through the Army Corps of Engineers, mass care to the American Red Cross, and health and medical services to the Public Health Service. Because the signatory agencies had agreed to the structure in advance, the plan gave FEMA a way to task many agencies at once, which was a real improvement over the scattered arrangements that came before it.
The plan still worked largely by pull. Federal agencies acted on mission assignments, and mission assignments followed requests from the state for particular resources, which the state assembled from what its counties reported. That chain assumes a county can find out what it needs and tell the state, and that the state can consolidate those needs into requests the federal side can fill. Andrew broke the chain at its first link. A federal system that waits for an itemized request will move slowly when the only government in a position to write that request has lost its means of seeing and reporting, and the later reviews returned to that finding again and again.
Short histories sometimes describe the Federal Response Plan as something written because of Andrew. FEMA published it in April 1992, about four months before landfall, so Andrew was the plan’s first catastrophic test and the storm did not produce it. The reviews of how the plan performed came after Andrew, and so did changes in how FEMA used it, later revisions, and its replacement by the National Response Plan in 2004 and the National Response Framework in 2008. If your training material puts the plan after the storm, correct it, because the real sequence carries the lesson: a structure that existed on paper delivered little until someone could tell it what to deliver and where.
Tallahassee and Washington: the contested record of who asked for what
Blame for the delay was argued in public while the response was still under way, and the argument ran along the obvious line. Florida officials, including Governor Lawton Chiles, said the state had asked for help and that federal assistance came too slowly. Federal officials said they could not act on general appeals and needed the state to say what it wanted, in what quantity and where. The dispute was sharpest over active-duty military forces. Accounts differ on when Florida asked for federal troops and how the request was worded, and also on whether Washington could have sent them sooner without a request in that form. I have not found a single source that both sides accept as settling it.
The setting made the argument hotter. Andrew struck in the closing months of a presidential campaign, with a Republican president seeking reelection and a Democratic governor in Florida, and press coverage at the time carried accusations in both directions. That context belongs in the record of how the delay was discussed. I treat it as a reason to read contemporary statements from either side with care, and I do not treat it as evidence of anyone’s motive.
The formal reviews mostly declined to settle the dispute as a question of who failed whom. The General Accounting Office and the National Academy of Public Administration examined the federal response, and a governor’s review committee examined the state side. Each described problems at more than one level of government. The federal reviews found that reliance on detailed state requests did not fit a catastrophic disaster, and the Florida review found weaknesses in the state’s own organization and in its ability to manage the resources that did arrive. Read together, the reviews describe a request model that did not hold up in an event of this size, with additional shortcomings at each level of government on top of that.
When Andrew comes up in a class, the easy version names one culprit, usually FEMA and sometimes the state. The record supports something more useful. Both sides’ public statements reflected their own positions, and the reviews found faults at more than one level, while the structural problem they identified was a request model that stalled when the requesting government could not assess its own damage. Present the competing accounts with their sources, say plainly that they conflict, and spend the class time on that mechanism, because it is the part your own agency can actually change.
The escalation: Andrew Card’s task force and the active-duty deployment
By the end of the first week, President George H. W. Bush had sent Transportation Secretary Andrew Card to south Florida to lead the federal relief effort, and active-duty forces had been ordered into the area. Over the following days the military deployment grew into what accounts describe as one of the largest domestic disaster missions the armed forces had undertaken up to that time. Accounts put the number of federal troops at its peak in the tens of thousands, serving alongside Florida National Guard forces under state control. I am not giving a single troop figure, because the published numbers vary with the date and with what each count includes.
The troops brought something the civilian system lacked in those first days, which was the ability to arrive self-contained. Military units came with their own communications, transport, food, water purification, field kitchens, medical capability and engineering equipment, and they did not need local power or telephones to work. They set up tent camps and feeding sites, cleared roads and distributed supplies. Teams on the ground and in the air also helped build the picture of need that the county had not been able to put together on its own. In effect, the federal government finally sent people to go and look, which was the step the request model had left to a local government that could no longer take it.
Active-duty forces had limits as well. Federal law generally restricts the use of active-duty troops for civilian law enforcement. Accounts of Andrew describe security being handled largely by the Florida National Guard in state status and by civilian police, including officers sent from other jurisdictions. The deployment also left the underlying design problem in place, because it came from a presidential decision made after days of visible failure. The reviews that followed asked how the government could reach that kind of decision earlier, on the basis of a plan and before the news coverage forced it.
Three reviews in 1993: GAO, NAPA and the Florida committee
The General Accounting Office, as GAO was then named, examined the federal response and reported to Congress in 1993. As its findings are generally summarized, GAO concluded that the federal government had no way to assess catastrophic damage quickly on its own and then act on that assessment without waiting for detailed requests from an overwhelmed state. It recommended building that capacity, along with clearer arrangements for using the Department of Defense in a catastrophe. GAO’s reports and testimony from that year are on its website, and they are where to go for the exact recommendations, which I am not reproducing from memory.
The National Academy of Public Administration, a congressionally chartered organization, published a review titled Coping with Catastrophe in early 1993 at the request of Congress. It examined FEMA as an institution as well as its handling of Andrew. As generally summarized, the review criticized the agency’s organization and leadership, including the share of senior positions held by political appointees. It also criticized how far national security programs had shaped an agency that the public expected to handle natural disasters, and it called for substantial reform.
In Florida, Governor Chiles appointed the Governor’s Disaster Planning and Response Review Committee, chaired by former Florida Senate president Phil Lewis. The committee reported in early 1993 on state and local preparedness. The Florida legislature created a dedicated trust fund for emergency management in 1993, financed by a surcharge on insurance policies, and in the following years the state put a Statewide Mutual Aid Agreement in place for its local governments. For the committee’s specific recommendations and how each was carried out, go to the report itself through the Florida Division of Emergency Management or the state library.
The three reviews looked at different levels of government and reached compatible conclusions. Each found that the existing arrangements assumed a damaged jurisdiction could describe its own needs. Each pushed in some way toward capacity that would move before that description was complete, whether through federal assessment and forward deployment or through stronger state organization and agreements that let neighbors help without negotiating terms in the middle of the event.
FEMA after 1993: James Lee Witt, a forward posture and the plan’s descendants
President Clinton appointed James Lee Witt to head FEMA, and the Senate confirmed him in 1993. Witt had run Arkansas’s state emergency management office, and he is generally described as the first FEMA director to come to the job from state emergency management. Under him the agency reorganized and gave more of its attention to natural disasters and to its working relationships with the states. It also moved toward sending people and supplies ahead of a formal request when a catastrophe was coming or had clearly happened. The responses to the Midwest floods of 1993 and the Northridge earthquake of 1994 were generally better received than the response to Andrew. I would not credit that improvement to any single reform, though, because those events differed from Andrew in both size and type.
The Federal Response Plan itself was kept and revised, including a 1999 edition. Its central design, support functions with named lead agencies, carried into the National Response Plan of 2004 and the National Response Framework of 2008. The number of Emergency Support Functions has grown since 1992 as functions were added and reorganized, so if you work from an older document, check it against the current Framework before relying on a function number. Communications is still ESF 2, which is the function most readers of this site will deal with directly.
The push problem did not go away. Reviews of Hurricane Katrina in 2005 described federal help again held up over who would ask for what, and the Post-Katrina Emergency Management Reform Act of 2006 amended the Stafford Act to give the federal government more room to move resources before a specific request in a major disaster. The details of those authorities belong to current FEMA guidance and to the statute, and I am not summarizing them further. The point for this guide is that Congress was still legislating on the problem Andrew exposed fourteen years after the storm.
From a southern compact to every state: how EMAC came out of Andrew
After Andrew, Governor Chiles pushed for an agreement under which states would help one another on terms settled in advance. The Southern Governors’ Association adopted a regional compact in 1993. In 1995 the compact was opened to states outside the South and renamed the Emergency Management Assistance Compact. Congress consented to EMAC in 1996, and over the following years every state joined, along with the District of Columbia and several territories. The National Emergency Management Association administers the compact, and its EMAC website is the place to check current membership, procedures and forms.
The problem EMAC addresses is legal and financial. States could send help to one another in 1992, but each deployment raised questions that had to be answered before people moved or while they were already working. Somebody had to decide who paid, whose liability protection covered the deployed workers, whether a paramedic’s or engineer’s license from one state counted in another, and who covered workers’ compensation if someone was hurt. EMAC answers those questions ahead of time. Broadly, the requesting state reimburses the state that sends help, and deployed personnel are treated as agents of the requesting state for liability and immunity purposes. Home-state professional licenses are recognized subject to limits the requesting governor may set, and the sending state keeps its own workers’ compensation and death benefit obligations to its people. Verify the details for any particular deployment with your state’s EMAC coordinator, because the compact text and the operating procedures carry conditions this summary leaves out.
Activation requires an emergency declaration by the governor of the requesting state. Resources then move on a written request that describes the mission and its estimated cost, and both states agree to it before anyone deploys. EMAC therefore moves what a state asks for, which means it inherits the same dependency that hurt south Dade in 1992, since a state that cannot see its damage will have trouble writing good requests. The compact removed the legal friction that slowed interstate help, while assessment remained a separate job for the requesting state. Katrina in 2005 produced the largest EMAC deployment up to that time, and NEMA has published after-action material on it that covers the mechanics of receiving help at that scale.
Agencies tend to plan carefully for sending resources through EMAC and much less carefully for receiving them. A requesting county needs staging areas, a check-in process for arriving teams, lodging and fuel, a radio and talkgroup plan the visitors can actually use, and a person with authority to sign for the mission. In south Dade, accounts describe outside responders struggling to find their way through streets that had lost their signs. The same thing will happen to any team that arrives after a wide-area disaster unless someone has written down how those teams will be oriented, given maps that use coordinates instead of street names, and directed to a staging location they can find.
What to do at your agency
- The county emergency manager opens the section of the emergency operations plan that covers requesting state assistance and confirms that it names a primary and an alternate person authorized to submit resource requests, and the job is finished when that section also states the backup path to the state EOC for when phones and internet are down, whether satellite phone, HF or amateur radio, or a runner.
- The radio system administrator or communications unit leader runs one test this month of a path from the county EOC to the state EOC that does not depend on commercial power or the public telephone network, and the job is finished when the date, the method and the result are logged in the communications annex.
- The emergency manager adds a requirement to the damage assessment annex that field teams report locations by GPS coordinates or U.S. National Grid reference in addition to street address, and the job is finished when the assessment form in the field kits has a coordinate field and at least one team has practiced filling it in.
- The emergency manager writes to the EMAC coordinator at the state emergency management agency to ask for the current process by which local resources are packaged and offered for EMAC deployment, and the job is finished when the reply is filed and the agency knows which of its teams, if any, are on the state’s list.
- The fire or EMS chief asks the agency’s human resources office for a written statement of how pay, overtime and workers’ compensation apply to an employee deployed through EMAC, and the job is finished when that statement is in the deployment folder and has been checked against the state’s EMAC guidance.
- The exercise planner adds an inject to the next scheduled exercise in which the county cannot complete any damage assessment for the first 48 hours, and the job is finished when the inject appears in the exercise plan with an expected EOC action of requesting resources without complete counts.
Takeaways
- Hurricane Andrew made landfall in south Dade County near Homestead early on August 24, 1992, and a National Hurricane Center reanalysis in 2002 reclassified it from Category 4 to Category 5 at landfall.
- The National Hurricane Center estimated United States damage at about $26.5 billion in 1992 dollars, and its direct death count for the United States is in the low twenties, with totals that include indirect deaths running higher depending on what each source counts.
- FEMA published the Federal Response Plan in April 1992, so Andrew was the plan’s first catastrophic test, and the reforms that followed changed how the plan was used and later revised it.
- The central problem the reviews identified was a request model that depended on local damage assessment, which the storm had largely destroyed in south Dade.
- State and federal officials blamed each other publicly, and accounts of the timing and wording of requests, especially the request for federal troops, still conflict.
- The 1993 reviews by GAO, the National Academy of Public Administration and Florida’s governor’s committee each found problems at more than one level of government, and each pushed toward help that could move before a complete request existed.
- EMAC grew from a 1993 southern governors’ compact, opened to all states in 1995 and received congressional consent in 1996, and it settles reimbursement, liability, licensure and workers’ compensation in advance while still depending on the requesting state’s ability to ask.